March 19, 2026 How do I Obtain Sign Installation Permits in Regina?

Obtaining a sign permit in Regina is a critical step in the installation process to ensure compliance with local bylaws and safety standards. The requirements and complexity of the permit process vary depending on the location and type of sign:

Types of Permits:

  • Permanent Sign Permits: These are required for lasting setups and involve submitting site plans and engineering drawings. Fees typically start at 100 dollars, and processing times generally range from 2 to 4 weeks, though complex heritage zones in downtown Regina can take 4 to 6 weeks.
  • Temporary Sign Permits: Used for items like banners, these require simpler notifications but must still adhere to specific duration limits.

Key Requirements and Regulations:

  • Zoning Compliance: Signs must follow specific size and placement rules, such as a 20-foot height limit in commercial areas and prohibitions on overhanging signs in certain zones.
  • Safety Standards: Installations must account for wind loads up to 90 km/h and include ADA accessibility for visibility.
  • Submission Process: Applications are submitted via the City of Regina portal and must include detailed drawings and material specifications.

SignsRegina.ca assists clients by handling the entire permit application process, drawing on 35 years of local experience to navigate these regulations. It is always recommended to confirm specific requirements with the City of Regina before beginning an installation to avoid penalties.


Related FAQs